Gas Line and Fire Hydrant

In between all of the testing of the Piles, continued work has been done clearing out the felled trees, removing an abandoned gas line and relocating a fire hydrant.  Both the gas line and fire hydrant required some extensive excavating work.  Both jobs took a full day to complete and then part of the next to put all of the removed soil back.

Advertisements

Comments are closed.

%d bloggers like this: