The Building is “Dried” In.

I have four different days of photos that go through the process of completing the roof and wrapping the building in Tyvek wrap.

The retaining wall for the docks has been completed and is really quite impressive with the water level so low.  Now that the wall is complete, work is being done to the south of the BH, clearing out the old brush and preparing the bank for vegetative stabilization.

A fair amount of work was done to prepare the floor for the concrete slab pour.  Very fine stone was raked in and a vapor barrier/ insulation was put over the stone.  Near the end of last week the rebar framework was going in place.  Once that is laid out the heating tubes get wound around and in between the rebar.  Yes, heating tubes…the concrete floor will be heated.