Parking lot and Plaza Complete

We are in the home stretch and the work outside the building has been happening FAST!!  The parking area is porous paving to assist with the water drainage.  Along the parking area there is a 10′ wide walkway that will also serve as the future Cayuga Waterfront Trail.  Ithaca College Grounds Crew have done there part planing shrubs, trees and grass.  I looks like a waterfront park!!!  Inside is more finish work, trim, stairs, veneer, cubbies and boat racks have all arrived and are being installed.  The drywallers and painters are back this week doing touch ups.  Below are photos from the past two weeks.

 